News
Harvard Quietly Resolves Anti-Palestinian Discrimination Complaint With Ed. Department
News
Following Dining Hall Crowds, Harvard College Won’t Say Whether It Tracked Wintersession Move-Ins
News
Harvard Outsources Program to Identify Descendants of Those Enslaved by University Affiliates, Lays Off Internal Staff
News
Harvard Medical School Cancels Class Session With Gazan Patients, Calling It One-Sided
News
Garber Privately Tells Faculty That Harvard Must Rethink Messaging After GOP Victory
Lowell students were left in the dark when power failed in parts of the building shortly after midnight last night.
According to a number of students, power failed first in a number of entries at around midnight and went out everywhere in Lowell House about 20 minutes later.
Engineering and Utilities workers from Harvard's University Operations Services arrived shortly after 1 a.m. to assess the situation.
At shortly after 2 a.m., workers were still busy disassembling Lowell's aging electric systems to pinpoint the cause of the problem. They said they had not yet been able to determine the cause of the outage. They verified that the outage was isolated to Lowell House.
Keycard access failed in some entryways, but remained active in most.
Hallway lights provided emergency lighting in all the entryways. Those systems are connected to a separate emergency electrical system. Dorm rooms, tunnels and Lowell's two courtyards, however, were eerily black.
Students said they were amused rather than miffed at the event.
"It's actually really nice," said Lowell House resident Whitney Ice '02. "I have an excuse to go to bed without finishing the rest of my work."
Ice was doing her laundry when the power began to fail.
"The lights and one of the washers went out, but the others stayed on," she said. "Then a while later they all went off."
--Staff writer C. Matthew MacInnis can be reached at macinnis@fas.harvard.edu.
Want to keep up with breaking news? Subscribe to our email newsletter.