News
Garber Privately Tells Faculty That Harvard Must Rethink Messaging After GOP Victory
News
Cambridge Assistant City Manager to Lead Harvard’s Campus Planning
News
Despite Defunding Threats, Harvard President Praises Former Student Tapped by Trump to Lead NIH
News
Person Found Dead in Allston Apartment After Hours-Long Barricade
News
‘I Am Really Sorry’: Khurana Apologizes for International Student Winter Housing Denials
With the installation of a new electrical plant in Pierce Hall of the Engineering School, four times the previous direct current will be provided for laboratory evperiments. The plant, which will be received at the School today, includes a 200 kilowatt generator driven by a 290 horse-power alternating current motor, and will be ready for use within a week.
Experiments which were impossible last year will be made possible by the new generator, which replaces a 50 kilowatt plant operated by a steam engine. The old generator has not been in use since the steam The direct current A small
The direct current A small
A small
Want to keep up with breaking news? Subscribe to our email newsletter.