News
HMS Is Facing a Deficit. Under Trump, Some Fear It May Get Worse.
News
Cambridge Police Respond to Three Armed Robberies Over Holiday Weekend
News
What’s Next for Harvard’s Legacy of Slavery Initiative?
News
MassDOT Adds Unpopular Train Layover to Allston I-90 Project in Sudden Reversal
News
Denied Winter Campus Housing, International Students Scramble to Find Alternative Options
The Cambridge Park Commissian has been making plans to extend the park system, above the Harvard Bridge along the river as far as Brookline street, crossing the Albany tracks by an overhead bridge. The sea wall will be continued some 280 feet and then turned in at an angle to meet a beach which will be constructed as far as the tracks. About 150,000 cubic yards of filling will be required, most of which will be taken from the river bed. This will reduce to a great extent the large mud flats which are so prominent at low water.
The parkway of the Cambridge Park Commission which now extends for a short distance above the Boylston Street bridge is to be continued to a small landmark known as Gerry's Landing. To this point the Metropolitan Park Commission are to extend the Fresh Pond parkway and here they intend to build a bridge connecting that park system with Soldiers Field.
Want to keep up with breaking news? Subscribe to our email newsletter.